Pile Driving Rig

FOLLOWERS

285

LIKES

To build a house you need a strong base, but to start building you first need concrete piles so here is the machine that will do the job.
It did use 7 M Motors and 1 older Micromotor.
All function are operated remote controled with the 4 recievers which are hidden inside the crane body so you won't see them and they still work verywell.

I did start converting 42042 but after a few hours the only things still in use are the outerbody of the crane and the undercariage.
All things inside the body are completely new build, and are tested for a few hours and did still work well with no problems.
The cabin was inspired by the older crane 8043.
The total time to design and build is about 30 hours and the instructions also took about 5 hours to make.

Hope you like it and happy building, and i like it if you leave a comment.

Video is on its way, will be online in a fewdays i hope.
Login to hide ads!

MOC-11751

Name Pile Driving Rig
Designer Lucky-Ramses
Designed 2017
Inventory 1817
Theme Technic
Modification of 42042-1 Crawler Crane
Star Wars™ Imperial Star Destroyer™
Already have some of the parts? Use the Build this MOC page to only show the parts you are missing.
Create an account to change the default filters used.

Waiting for Inventory to load